Our Projects:

Projects Delivered

• Feasibility Study Detailed Design, Supply of Equipment, Start-up, trial run and Top Supervision of Lahore Solid Waste Compost Project, Bund Road, Lahore-Pakistan 1000, Tons per day municipal solid waste
• Feasibility Study and Detailed Design of Padri landfill site Solid Waste Compost Project, Lahore-Pakistan 650, Tons per day municipal solid waste
• General Consultants to SPML Infra Ltd (India) to design, develop and operate Waste Treatment Projects in many Indian cities
• Consultancy services to improve solid waste management at TMA level through private sector participation for Mirpur Khas, Saddar and Gulshan e-Iqbal Karachi-Pakistan.
• Consultancy services for Pre-feasibility study on existing collection system, composting and opportunity to install a compost plant in Multan-Pakistan.
• Complete feasibility study for designing, installations, and operations for a Central Incinerator to treat Hospital Waste generated in Lahore City. Also, preparation of pre-feasibility study for a Hospital Waste Management Plan for 8 major cities of Punjab-Pakistan on behalf of CIDA-Inc.
• Public health expertise to evaluate the current / on-going Rural Water Supply and Sanitation (RWSS) in Azad Kashmir and to design and demonstrate a revised public health model for new upcoming schemes in the area
• Supervision of EIA and its public hearing for setting up Capital Compost project in Islamabad-Pakistan.
• Financial Modelling and Tariff Determination for different alternate energy projects for textile/ sugar mills
• Preparation/ Approval of PIN and PDD from DNA for Kissan Compost Waste Treatment Project
• Survey and designing of low and high organic zones for Lahore Compost Project that is already registered with UNFCCC
• Preparation/ Approval of EIA and Environmental Social Assessment (ESA) for Lahore Waste Treatment Project

Projects in hand

• Feasibility Study and Detailed Design of 600 Tons per day municipal solid waste handling facility at Raj band Landfill site Khulna Bangladesh
• Feasibility Study of 600 Tons per day municipal solid waste handling facility at Ghazilabad Landfill site Mizar Sharif Afghanistan
• General consultants for designing of a waste treatment project in Bogota, Colombia
• General consultants for composting project in Buenos Aires, Argentina
•Detailed design, feasibility study to set up an Integrated Solid Waste recycling facility at Askar landfill site in Bahrain on BOT Basis
•Feasibility study, detailed design for setting up a 1000 TPD composting plant at Umm Al-Afai landfill site in Doha -Qatar
•Feasibility Study, detailed design to set up a C& D waste recycling facility in Rawadat Rashid landfill site-Doha Qatar on DBO basis